Machinery Usage Log List
A usage entry records how much a machine was used on a project on a given date.
| Field | Notes |
|---|---|
| Machine | From the Machinery register |
| Project | |
| Cost code | The BOQ line or task the cost is charged to |
| Date | |
| Quantity | In the machine’s rate unit, e.g. 1.5 Days |
| Rate | From the machine’s rate |
| Fuel cost | Optional |
| Total | Quantity × Rate + Fuel cost |
log usage
- To log usage, click + Log usage on the Machinery Usage Log or on a machine’s page, fill in the fields and submit.
- Pick a cost code for every entry: an entry without one is shown as Not coded, and although its cost is recorded against the project, it does not reach the BOQ’s actuals.
- The Machinery Usage Log lists every entry with its date, machine, project, cost code, quantity, total cost and status, and can be filtered by machine, project and date range.
- The Procurement Officer and Store Keeper maintain the machinery register, and site roles log usage.
Machinery Log Detailed View
Last updated 1 day ago
Was this helpful?