**Material Consumption** issues material out of a project’s site stock when it is used. Each entry can be booked to a **cost code**, so the material is costed against the BOQ.



`Open it from: Procurement → Material Consumption`

### Material Consumption list

The list shows each entry’s **ID**, **Date**, **Project**, **Items consumed** (each with its quantity), **Cost code**, who recorded it (**By**) and its **State**. You can filter by project.

![](/files/Screenshot 2026-11-12 104851.webp)

### Record consumption

1. Click **+ Record consumption**.
2. Select the **Project**.
3. Select a **Cost code** to book the material against a BOQ group or line. Leave it blank to record the issue without costing it.
4. Add each item and the quantity consumed.
5. Click **Record consumption**. It is saved as **Draft**.
6. Click **Submit** to deduct the material from site stock.

![](/files/Screenshot 2026-11-12 105149.webp)



### The consumption page

The page shows the entry type (**Material Issue**), the date, the **Project**, the **Cost code** (or “Not cost-coded”) and who recorded it, followed by each item with its quantity and UOM. On a draft, the actions are **Edit**, **Delete** and **Submit**.





### Status

**Draft** (nothing deducted yet), **Submitted** (deducted from site stock) and **Cancelled** (reversed).

### Rules

- One entry is booked to **one cost code**. If material is used for two BOQ groups, record two entries.
- Only **submitted** entries reduce **Material at site** and appear in **Consumption by cost code**.
- An uncoded entry is still issued from stock, but its cost stays outside the estimate.