An assembly is a reusable item of work priced per unit, such as “Earthwork excavation – mechanical, per m³”. It is made of Rate Master rows (materials, labour and equipment), each with the quantity needed for one unit. You build it once and reuse it in many BOQs and estimate templates. 



![](/files/image3caae0.webp)
*Assembly list view*

### **Create an assembly**

1. Go to **Estimation → Assembly** and click **+ New**.
2. Fill in the assembly details (see the table below) and click **Create assembly**.
3. On the assembly page, click **+ Add Component** and pick a Rate Master row.
4. Enter its **Coefficient**: how much of that resource one unit of the assembly needs.
5. Repeat for each component. The rate per unit is worked out as you go.



![](/files/imagec0b0ea.webp)
*Create new Assembly*

### **Assembly fields**


| Field       | Type      | Mandatory | Notes                                                                                 |
| ----------- | --------- | --------- | ------------------------------------------------------------------------------------- |
| Code        | Data      | Yes       | Short, stable ID, e.g. ASM-RCC-M25. Must be unique.                                   |
| Name        | Data      | Yes       | What the work is, e.g. “Cement plaster 12mm CM 1:4 – internal”                        |
| Unit (per)  | Link: UOM | Yes       | The unit the assembly is priced in. Coefficients are “how much per one of this unit”. |
| Category    | Select    | No        | Groups assemblies, e.g. Earthwork, Concrete, Masonry, Plaster, Finishing, Formwork    |
| Notes       | Text      | No        |                                                                                       |
| Rate / Unit | Currency  | Auto      | Sum of the component amounts                                                          |


**Component fields**


| Field       | Notes                                                                                               |
| ----------- | --------------------------------------------------------------------------------------------------- |
| Resource    | The Rate Master row used (material, labour or equipment)                                            |
| Coefficient | Quantity of that resource needed for one unit of the assembly. Can be edited directly in the table. |
| Unit, Rate  | Taken from the Rate Master                                                                          |
| Amount      | Coefficient × Rate                                                                                  |




![](/files/image99914a.webp)
*Assembly detailed view*

### **How the rate stays current**

The assembly page shows **Rate / Unit (Live)**. Component rates are read from the Rate Master, so when a rate changes there, the assembly’s rate changes too.

BOQs work differently. When an assembly is added to a BOQ, its components and rates are copied into the BOQ, and later changes to the assembly or the Rate Master don’t change that BOQ. A BOQ line is updated only when it is re-exploded from the assembly.

### **Edit an assembly**

1. Open the assembly from **Estimation → Assembly**.
2. Change the components directly on the page:
  - Edit a **Coefficient** in the table.
  - Click **+ Add Component** to add a Rate Master resource.
  - Click **×** on a row to remove a component.
3. To change the code, name, unit, category or notes, click **Edit**, make the change and save.

The Rate / Unit is recalculated after each change.



### **Delete an assembly**

1. Open the assembly and click **Delete**.
2. Confirm the deletion.

You can’t delete an assembly that is used in a BOQ or an estimate template. The system blocks the deletion and names the record that uses it. Remove the assembly from that record, then delete it.



![](/files/imagedf7cd5.webp)
*Edit and Delete option in Assembly*